Renovation Contractor in Bali for Houses and Villas
Renovation starts with understanding the existing building. We survey, check what will be demolished or added, and prepare a quotation with a clear scope before any work begins.
Renovation work we do
Extensions & added floors
Extra rooms or floors after the existing structure has been checked.
Layout changes
Demolition and new walls to change how spaces are used.
Roof & ceilings
Leaking roof repairs, replacing roof framing or covering, and ceilings.
Bathrooms & kitchens
Re-tiling, drainage and wet-area finishing.
Paint, facade & floors
Repainting, facade repairs and replacing tiles or granite.
Swimming pools
Leak repairs, new waterproofing and pool finishing.
Renovating rental villas in Bali
Many Bali villas need refreshing to stay attractive to guests: updated bathrooms, a repainted facade, pool repairs or extra rooms. Because rental villas have guest bookings, renovation can be planned in stages, area by area.
We set a clear work sequence so active work zones are separated and demolition does not damage parts of the building outside the scope.
Renovation stages
Stalled renovation projects
If your renovation has stopped halfway, we can survey the existing condition, check the work already installed, calculate the remaining scope and quote to finish it.
Service areas in Bali
We carry out construction and renovation work across Bali, including Badung (Canggu, Seminyak, Kuta, Jimbaran, Uluwatu, Pecatu, Ungasan, Mengwi), Denpasar (Renon, Sanur), Gianyar (Ubud, Sukawati), Tabanan (Kediri, Kerambitan, Cemagi), Klungkung including Nusa Penida, as well as Buleleng, Karangasem, Bangli and Jembrana. For sites with difficult access, material transport is priced after the site survey.
Frequently asked questions
How much does renovation cost in Bali?
Renovation cost depends heavily on the existing condition and the items being changed, so the price is set after a survey and a clear scope.
Can renovation be done while the villa is operating?
Staged, area-by-area work can be discussed during the survey to fit guest bookings and site conditions.
Can you add a floor to an older building?
It can be considered after the existing structure is checked. An added floor must follow the structure's capacity and proper drawings.
Is demolition waste removed?
Handling of demolition waste is listed in the quotation scope so it is clear from the start.
Other services
Ready to start your project?
Send your location and type of work on WhatsApp. We will schedule a survey and prepare a quotation with a clear scope.